Whats New?
- Stage 1 has begun construction! That means the cutouts have been moved outside
- Blu's high-ground on last now has a sign telling players the door is one way and also added 2 big windows that allow red to see who's on the other side, with a small area under the grate for spies to de-cloak and blu engis to set up
- B has been opened up and walls moved back, making the other area smaller and B bigger, the ground around the point was lowered
- no changes to A? Are you mad! yes.
- i may be missing some changes because i didn't write down the changes while i made them/before i made them so: "minor changes"
Stage 1 is already half made, but not playable, if you go into spec you can look at it i guess
Thanks to all the playtesters!
Special thanks to
i dinne ken for extra, private feedback!