- the ground in the first part is now "less" flat
-Added a tree too
- Redone the entire Inside part going to B
-Drop down remove
- the Right flank removed
- redone the underway
- added new flank with one way door
- B is widened
-added cover
-one flank from last moved further to point
-the flank on the top was removed and split into two