1-7-09
Due to concerns about my block in of Point A being too large, I have attempted to shrink it down, started adding cover, also reduced the height of the CP hill... the green box will eventually be a crane, probably a model... its just a rough in. Let me know what you think about this size compared to the last
11-29-08 Changing name to cp_pyrite (the technical name for foolsgold)
this name is not final and still may change. this is the 6th or so name change I've gone through...
Original thread located in post 2
Due to concerns about my block in of Point A being too large, I have attempted to shrink it down, started adding cover, also reduced the height of the CP hill... the green box will eventually be a crane, probably a model... its just a rough in. Let me know what you think about this size compared to the last
11-29-08 Changing name to cp_pyrite (the technical name for foolsgold)
this name is not final and still may change. this is the 6th or so name change I've gone through...
Original thread located in post 2
Last edited: