- Apr 17, 2009
- 205
- 38
so as you all know, PLR commonly has path tracks that are perfect mirrors of itself so each team has exactly the same distance to travel over the same number of path_tracks. Problem is, how do i do this?
I selected my one complete path, with all 96+start=97 path tracks, held shift and copied them...and to my horror i got a cob-web of pathing going between the old set and my new set. :thumbup:
/sarcastic...
Any suggestions to get a perfect match of my path tracks without having to manually measure each and every 97 path tracks to make sure it's symmetrical. Thanks guys, if there's a way then, :drool1:
I selected my one complete path, with all 96+start=97 path tracks, held shift and copied them...and to my horror i got a cob-web of pathing going between the old set and my new set. :thumbup:
/sarcastic...
Any suggestions to get a perfect match of my path tracks without having to manually measure each and every 97 path tracks to make sure it's symmetrical. Thanks guys, if there's a way then, :drool1: